An inverter with a built-in charger and an automatic transfer switch (ATS) is the core of a small standby power system. It converts DC to AC when mains fails, recharges the battery when mains returns, and moves the load between the two sources automatically. Understanding transfer time, charging behaviour and automation logic is essential for anyone specifying reliable backup for homes, shops, telecom cabinets or light industrial sites.
What Each Function Does
• The inverter stage converts DC (12 V, 24 V or 48 V) into a 220 to 230 V AC output for the protected load.
• The charger stage converts mains AC back into DC to recharge the battery bank, usually with a multi-stage profile.
• The ATS senses mains presence and moves the load between mains and inverter without manual intervention.
In a combined unit these functions share sensing and control logic, which is why the settings interact.
Understanding Transfer Time
Transfer time is the interval between mains loss and the inverter output being available to the load. It is normally quoted in milliseconds and falls into broad classes:
• Very short transfer (under about 10 ms): suits sensitive electronics such as computers, servers and medical devices.
• Standard transfer (roughly 10 to 40 ms): fine for lighting, tools and general appliances.
• Longer transfer: acceptable only for loads that themselves tolerate a brief interruption.
Key points for specification:
• Compare the transfer time with the ride-through capability of the critical load.
• Remember that the ATS relay and the inverter start-up together determine the final figure.
• Test transfer under real load, because a light load can give a deceptively fast result.
Charging Behaviour
A well-designed charger does more than push current into a battery. Look for a multi-stage profile:
• Bulk stage delivers maximum current to raise the battery quickly.
• Absorption stage holds a steady voltage to complete most of the charge.
• Float stage maintains a lower voltage to keep the battery topped up without overcharging.
Selection criteria:
• Charger current rating relative to battery capacity; too low means slow recovery, too high can stress smaller batteries.
• Temperature compensation so charge voltage tracks battery temperature.
• Adjustable settings for the actual battery type and bank voltage.
• Protection against reverse polarity, over-temperature and short circuit.
Backup Automation Logic
A combined inverter and ATS should automate a clear sequence:
• On mains failure: the ATS opens, the inverter starts and supplies the load within the quoted transfer time.
• On mains return: the ATS reconnects the mains, the inverter stops inverting and the charger begins replenishing the battery.
• Priority and delay settings decide whether the load runs on mains or inverter first, and how long the unit waits before switching, which protects the battery and reduces cycling.
Programmable delay, load-shedding and generator-compatible dry contacts turn a simple backup into a manageable system.
Standards and Safety
• EN 62040 is the relevant performance and safety standard for UPS-class backup behaviour, including transfer and output characteristics.
• IEC 62109 covers inverter safety, isolation and protection.
• IEC 60364 governs the AC installation, earthing and protection on both the mains and inverter sides.
• EMC Class B limits emissions where the equipment shares an environment with sensitive electronics.
Confirm the input DC voltage, the output voltage and frequency, and that the charger current suits the planned battery bank before ordering.
Commissioning Steps
• Verify the ATS wiring so mains and inverter supplies are never paralleled incorrectly.
• Set battery type, charge voltage and charger current to match the actual bank.
• Set the mains-to-inverter priority and transfer delay according to the load.
• Simulate mains loss and measure the actual transfer time under full load.
• Confirm the charger reaches float voltage and holds it.
• Check terminal torque and protection devices against IEC 60364.
Troubleshooting Common Issues
• Load reboots during transfer: transfer time is too long for that load; add a short-ride-through supply or select a faster unit.
• Battery never reaches full charge: check charger current rating, charge voltage setting and temperature compensation.
• Frequent switching: check mains quality and the transfer delay setting.
• Over-temperature on the charger: confirm ventilation and that charger current is within the battery recommended range.
• Battery voltage does not recover after transfer: confirm the charger is enabled, the bank voltage setting is correct and the mains supply is actually reaching the charger input.
Key Takeaways
Specify transfer time against the load tolerance, insist on a proper multi-stage charger with temperature compensation, and configure the automation logic deliberately. When the transfer time, charging profile and switching priorities are matched to the load and battery, the combined inverter and ATS delivers dependable unattended backup.